2000
Obtaining licence PTZ 00667 TE and commencement of quartzite-sandstone mining at Ryboretskoye deposit
2002
LOKOMA crushing and screening plant put into operation
2006
Commissioning of the new Sandvik crushing and screening plant
2010
Launch of a new high-capacity quay-loading complex "Telestacker" TS-842 and 4 units of trucks "MAN" for transportation of crushed stone.
2012
Acquisition and commissioning of five motor vessels for crushed stone transportation
2014
Start of production of new narrow fractions from gabbro-diabase
5-10 мм, 5-15 мм; 10-15 мм; 15-20 мм
2018
Acquisition and commissioning of new Caterpillar equipment
2021
Reconstruction of Sandvik crushing and screening plant with the possibility to produce new Euro fractions (0-4 mm; 4-8 mm; 5.6-8 mm; 8-11.2 mm; 8-16 mm; 11.2-16 mm; 16-22.4 mm; 22.4-31.5 mm)
2001
Construction of a shift camp
2004
Purchase and commissioning of Atlas Copco ROC L6 drilling rig
2007
Obtaining licence PTZ 01431 TR for the development of high-strength gabbro-diabase rocks at the new Yuzhno-Kakkarovskoye deposit
2011
The enterprise is committed to deep modernisation of the technological process with gradual renewal of all mining and transport equipment
2013
Acquisition and commissioning of new Caterpillar mining equipment: 3 heavy-duty mining dump trucks, 3 front loaders, 3 mining excavators
2017
Achieved maximum annual volume of 1.6 million tonnes of finished product shipments
2019
Acquisition of a new KAMAZ crane unit KS-65713-1
2022
Commencement of construction of a new, modern, unparalleled in the North-West of Russia - a quay complex with the capacity to load crushed stone into water transport up to 3 million tonnes per year